Long story short, I had to get the bathroom vanity installed so that the granite people could make the template and I ended up working on it very late, that's typlical in the Casteel house work on something into the night. The funny part is that Brent the builder said that I could cut the drain line to make it easier to install, boy was he wrong. He didn't know that the plumbers had pressurized the lines and when I made the cut 20 gallons of water spilled out onto the bathroom floor and ran into the closet and master bedroom. I spent the next hour mopping up water and cleaning up the mess, I had to finish the job the next day because I ran out of time. On a positive note, the floors are fine, the cabinet is installed and we are getting granite tops tomorrow.