Wednesday, February 22, 2012

Movin' On Up

 Day two and a half of framing produces much of the second floor.  Here's the future front door area.

 Future view from the master shower - sans the dumpster and outdoor loo!
 Entrance to the loft.
 Master bathroom doorway.
 Ty standing in the future living area expansion.

 It looks sorta stuck on doesn't it?  It should blend better when the roofline is fixed to run into the addition and everything is painted a mutual color.
Now, we can't wait to see the tower go all the way up!!!

No comments:

Post a Comment